Manhole Rehabilitation and Utilities

Key has a state of the art pressure drill with all of the bits, sleeves, pumps and machinery required to deliver a turn-key drilled foundation project.  We have also been the drill contractor where our responsibility is to drill the hole and leave others to place the rebar, concrete and finish the completed pier.

In 2007, Key drilled more than 300 concrete piers in sizes ranging from 24”- 60” in diameter with depths up to 25’.  We have the ability to finish the tops of the piers either square or round.

Key has poured piers for wind energy projects, electrical transformer stations and cell towers.